Skip to content
Home Articles Standards About Contact
MIG Field Study

Gas Welding MIG/MAG Service: Process, Gases & Costs

NH
Nicholas Harper · Dec 6, 2025 · 46 min read
Table of Contents

A fabricator hands you two quotes for the same 20-foot stainless handrail: one from a TIG shop, one from a MIG shop, and the MIG quote is nearly half the price. Three weeks later the cheap rail comes back with rust bloom along the weld and the client is asking who paid for the rework. The difference was never about price — it was about which gas-shielded process was specified, how the shielding gas was managed, and whether the service came with a written procedure. This is the full story of MIG/MAG (also called GMAW or gas-shielded arc welding) service: how it works, where it wins, where it quietly fails, and what to demand from anyone who quotes you a gas welding job.

I’ll rewrite this section, tightening the prose while preserving every fact and link.


Original fragment: roughly 830 words. I need to land between 560 and 840. Let me write tightly, aiming ~700-780 words, keeping all facts and all 10 links.

What “Gas Welding MIG/MAG Service” Actually Means

Most bad welding quotes start as a vocabulary problem. Ask three shops for a “gas welding” quote and you may get three different processes, three prices and three expectations about finish quality. The buyer ends up paying for that ambiguity.

In everyday shop talk, “gas welding” almost always means MIG/MAG: an arc process where a continuously fed wire electrode melts into the joint under a shielding gas. In regulatory language it means something else entirely, oxy-fuel torch welding, where a torch burns fuel gas and oxygen to cut, braze or preheat. OSHA keeps the two apart, with 29 CFR 1910.252 covering welding, cutting and brazing in general, and 1910.253 covering oxygen-fuel gas welding specifically.

Short Note: “Gas welding” has two meanings. In the shop it means MIG/MAG (GMAW), an arc process. In the rulebook it means oxy-fuel torch work. If a quote says only “gas welding”, ask which process and which rulebook before you compare it to anything else.

MIG, MAG, and the formal name GMAW

MIG stands for metal inert gas, the term used in the United States. MAG stands for metal active gas, the term used in most of Europe. Inert refers to argon, which does not react with the molten pool. Active refers to gases such as CO2 and argon/CO2 mixes, which help stabilise the arc. Both are the same process, officially called gas metal arc welding, or GMAW, in AWS and ISO terminology.

So “MIG/MAG service” is one process with two regional names, not two processes. Naming gets sloppier in practice: some shops call any steel-wire arc job “MIG”, others reserve “MAG” for stainless or aluminium. If you want clarity, ask for the gas mix and the wire type instead of the label. And never let a shop blur MIG with TIG. TIG is gas tungsten arc welding, a different process with a non-consumable tungsten electrode, and it is the reason our aluminum MIG welding guide spends so much time on gas choice.

An arc process with a continuously fed consumable, not a torch

In oxy-fuel torch work the torch tip is the electrode and there is no filler wire. In GMAW the arc sits between a continuously fed wire and the workpiece. The wire melts at the contact tip and becomes the filler metal. That continuous feed is why MIG lays down far more weld metal per hour than stick welding: nobody stops to change an electrode every few minutes.

The four mechanical elements

Every MIG/MAG setup, from a job-box in a farm workshop to a robotic cell, has the same four parts:

  • Power source: the welder itself, either constant voltage or constant current.
  • Wire feeder: a motorised roller set that pushes the spool wire at a set speed, usually stated in inches per minute.
  • Torch or gun: the handle, liner, contact tip and gas nozzle that deliver wire and gas to the arc.
  • Shielding gas supply: regulator, cylinder and, ideally, a flow meter to set the actual cfh at the nozzle.

Gas is a consumable like wire. It gets depleted and has to be replenished on site, which is why it belongs on a quote as a line item rather than being treated as a one-time purchase.

Transfer modes decide the bead shape

How the wire transfers to the puddle is called the transfer mode, and it sets both the bead profile and the heat going into the part.

Mode How it behaves Typical use
Short-circuit (globular) Wire tip touches the pool, shorts out, pinches off Thin material, out-of-position work
Globular Large droplets transfer, heavier spatter General carbon steel work
Spray Fine droplets, high deposition, minimal spatter Flat and horizontal positions on thicker plate
Pulsed spray Spray pulsing cycles to control heat Stainless and thinner plate needing fine control

Polarity and machine mode

Solid MIG wire runs on direct current electrode positive (DCEP). The wire is the positive electrode, the workpiece is negative, and the electron stream drives deep penetration into the steel. Run solid wire backwards on DCEN and you get stubbing, erratic arc noise and a raised, ugly bead. Flux-cored aluminium wire is the notable exception, running on DCEN.

Machine mode matters just as much. Constant voltage (CV) machines are self-regulating: an arc-length change changes current, and modern synergic machines pair a wire-feed speed with a pre-programmed voltage curve for a given material and thickness. Constant current (CC) machines hold current steady and rely more on welder technique, which is why CC dominates stick welding and some flux-cored work.

Quote the process, not the machine brand

Be careful with brand names and gas supplier names. “Gas-shielded” also covers FCAW, where flux-cored wire runs under an auxiliary gas shield, and some shops will quote either. A name such as Air Gas is a supplier, not a process, as our guide to Air Gas welding sets out. What matters on a quote is the process, the wire specification, the gas mix, the transfer mode, the applicable procedure and who performs inspection. Machine brand means nothing. Qualification does: AWS publishes A3.0M/A3.0:2025 for welding inspection, and ASME BPVC Section IX governs welder and procedure qualification for code work.

One last clue to the process: under OSHA 1910.252(b)(2)(ii)(H), ferrous gas-shielded arc welding calls for a shade 12 helmet filter and nonferrous gas-shielded arc welding a shade 11, against shades 4 to 8 for torch gas welding. Different gear means a different process, and it is worth confirming the shop has the right protection for the work you are buying. If you are comparing processes for a specific job, our breakdown of why SMAW still wins in certain situations is a useful counterweight.

How a Professional MIG/MAG Service Runs From Quote to Final Weld

A quote tells you what a supplier thinks the job will cost. A good service tells you what it will do about it. That difference is a workflow, and once you see the steps, you read any MIG/MAG quote like a specification instead of a guess.

Scope, Drawings and the Joint Design Decision

The first conversation is about documents, not price. A thorough shop wants drawings or sketches, material grade and thickness, service conditions and the governing code. It then reviews joint design, the step clients most underestimate. Bevel angle, root gap and root face move cost more than people expect: a square butt on 12 mm plate and a 60 degree bevel on the same plate can double the arc time, wire and gas burned, yet both get sold as “a 12 mm weld”. Joint design is settled before the number is written.

What a WPS and PQR Actually Do

A Welding Procedure Specification is the written instruction for the joint: filler metal, shielding gas, transfer mode, voltage and wire feed, travel speed, preheat and interpass temperature, sequence and backing. A Procedure Qualification Record is the evidence that the procedure was tested on qualified coupons and measured. For coded work neither is optional. ASME BPVC Section IX governs qualification of welders, operators and procedures for ASME code construction, while structural work usually runs to AWS D1.1/D1.1M, or D1.2 for aluminum. AWS has authored more than 350 welding standards, so guidance is not the shortage. Shops working to it are.

How a Shop Proves Its Welders Are Qualified

Procedures do not weld anything. People do. Welder performance qualification, or WPQ, shows that a specific welder can make a compliant weld in a given process, position and filler metal. Shops prove it with test coupons, visual and often tensile or bend testing, and they track continuity because requalification intervals are finite. Look for the AWS Certified Welder Program, WPQ endorsements, and inspectors holding CWI or SCWI credentials, including an ASME Section IX endorsement. Those mark an operation that documents competence rather than asserting it.

Shop Work Versus On-Site and Mobile Work

Moving a gas-shielded process to a site adds problems a shop floor never has.

  • Cylinder staging. Shielding gas must reach the site in the correct mix, cylinders secured upright and staged clear of the hose run. No supply, no MIG.
  • Power. Site power is often too weak or dirty for pulse and spray machines, so a generator sized for the job belongs in the quote.
  • Weather. Wind kills a gas shield. Dry air, a wind break and a sheltered position are plan, not hope. OSHA 1910.252 applies in full on site.
  • Access and positioning. Overhead, inside a frame or from a scaffold changes the hours and the technique.

Where the correct gas cannot be supplied at all, the process may have to change and flux-cored wire becomes the fallback. Raise it early, since aluminum flux core welding behaves very differently from gas-shielded work and is not a drop-in substitute. For repeat production, mechanized or robotic GMAW cells start to make sense, where a dedicated aluminum MIG welding setup pays for itself in cycle time and consistency.

Fit-Up, Welding, Inspection and Handover

Fit-up is where quality is won: accurate joint alignment, a planned tacking sequence, controlled root gap, and a preheat plan when thickness and carbon content demand it. Welding follows the procedure, with consumables changed on schedule and heat input watched. Then inspection: visual examination is universal, magnetic particle or dye penetrant on stainless and other non-magnetic materials, ultrasonic testing on thick carbon steel, and radiographic testing on pressure piping, each judged against acceptance criteria named in the code, not the welder’s opinion.

Then cleanup, then paperwork, where many jobs quietly fail. If the pack is not delivered, assume it does not exist.

Two Jobs, Two Entirely Different Services

A 3 mm 304 stainless handrail and a 12 mm carbon steel base plate are different services, not the same job. The rail burns through if heat is uncontrolled, blooms with rust without back purge, and is touched by people. The plate may be a coded structural or pressure part needing full documentation and NDE.

Aspect 3 mm 304 stainless handrail 12 mm carbon steel base plate
Gas Argon based tri-mix or 98/2 75/25 argon-CO2 or 100% CO2
Transfer Pulsed or short-circuit, low heat Spray, multi-pass
Key risk Burn-through, contamination, rust bloom Distortion, lack of fusion, HAZ cracking
Special steps Back purge, dedicated liner and wire Preheat and interpass control
Documentation WPS, welder record, material certs Full coded package plus NDE reports

Short Note: Handover pack. Ask for the WPS used, welder qualification records covering that process and position, material certificates for base metal and consumables, NDE reports with acceptance criteria referenced, inspection records, scope and drawings, and a handover summary naming the gas, wire and parameters actually used. For coded work, the procedure qualification record belongs in the pack too. No pack, no job finished.

Shielding Gas: The Heart of a MIG/MAG Service

Ask a fabricator what separates a good MIG weld from a bad one and you will hear the same answer: the gas. Not the machine, not the wire brand, not travel speed. The shielding gas is the only consumable standing between a molten puddle and everything in the air that wants to ruin it. It costs a few dollars an hour and decides whether a handrail passes inspection or comes back rusting along the weld.

Here is the uncomfortable truth behind most cheap MIG quotes. Gas is the easiest place to cut a corner and the hardest place to fake. A shop can quote a legitimate wire package and a capable machine, then run the job on whatever cylinder happens to be on the truck. The client rarely sees the difference until months later.

What the shielding gas actually does

Shielding gas does three jobs at once, and each one shows up as a different failure mode. The third of those is why “just use argon” is bad advice for most steel work, and why “just use CO2” is bad advice for stainless and aluminium.

  • Protection. The gas blankets the arc and puddle, keeping oxygen, nitrogen and hydrogen out. When protection fails you get porosity: gas pockets trapped in the bead that weaken it, feed corrosion and fail inspection.
  • Arc stabilisation. The arc needs an ionised column to conduct current. Argon ionises more readily than CO2, so argon-rich mixes give a stable, focused arc while pure CO2 burns a more aggressive, erratic one.
  • Penetration and bead shape. The gas influences how the arc drives into the puddle, how wide the bead lays out and how much spatter flies. Same wire, same machine, different mix, different weld.

The mixes you will actually meet

These are the standard trade blends, drawn from practical comparisons in ESAB’s shielding gas guide and Miller’s gas selection notes.

Gas mix Best for Transfer mode Spatter Penetration Cost note
75% Ar / 25% CO2 (C25, M21) Carbon steel, stainless Short-circuit/spray Low Medium-high Mid-range; the industry default
100% CO2 (C100) Heavy carbon steel fabrication Spray High Deep Cheapest per cylinder
90% Ar / 10% CO2 (C10) Carbon steel, thinner gauges Short-circuit, spray Low to moderate Medium Between C25 and C100
98% Ar / 2% CO2 Stainless steel Spray, pulsed spray Very low Medium Lower-cost stainless option
98% Ar / 2% O2 Stainless, special applications Spray Very low Medium Specialty mix
90% He / 7.5% Ar / 2.5% CO2 (tri-mix) Stainless, thin wall Short-circuit Low Medium Premium
100% argon Aluminium, copper Spray, pulsed spray Low Shallow, wide bead on aluminium Widely stocked
Argon/helium blends Thick aluminium, copper Spray Low Controlled Expensive

C25 is the sensible middle ground: minimal spatter and a clean bead profile for far less cleanup than pure CO2, at a higher price. C100 is the cheapest way to run steel and the noisiest, with a rougher arc and more spatter to grind off. Good for structural work where appearance is secondary, poor for a visible handrail.

For stainless, Miller notes that many modern power sources are programmed for 98% argon/2% CO2 as a lower-cost alternative to helium tri-mix, while cautioning that too much CO2 in stainless work can cause porosity. Tri-mix buys short-circuit capability on stainless-capable machines. For aluminium, 100% argon is the standard MIG gas because it permits spray or pulsed spray transfer and keeps carbon out of the puddle, as covered in the aluminium MIG welding guide.

The numbers worth memorising

  • Flow rate: roughly 25 to 35 cubic feet per hour (cfh) for MIG short-circuit transfer, other MIG modes run slightly above 35 cfh, and TIG typically runs lower.
  • Contact tip to work distance: about 1/4 to 5/8 inch. Too far away and the shielding gas escapes before it reaches the puddle.
  • Wind: a 10 mph breeze will strip shielding off the arc. Use a wind screen or tent outdoors.
  • Regulator: purge the line before attaching it so air and moisture do not reach the diffuser.
  • Nozzle: clean spatter off the inside. A blocked or mismatched nozzle scatters the gas cone and destroys protection.
  • Multi-process machines: confirm the machine is switched to the correct gas port and process mode. Wrong port, no weld at all.

Measure flow at the gun with a flow meter, not at the cylinder. A 40 cf cylinder at 30 cfh gives roughly 75 minutes of weld time; a 300 cf cylinder gives about ten hours. For production work, bulk supply avoids cylinder-change downtime that quietly inflates labour hours on a job quote.

Note: Too little flow leaves the puddle exposed, so air gets in and the weld fills with porosity. Too much flow does not protect better; it creates turbulence around the arc, drags oxygen into the shield and wastes paid gas. More is not safer.

Quick Note: Gas-shielded is not the only option. Flux-cored wire (FCAW) can eliminate the gas bottle entirely, making it the sensible choice for long outdoor or structural jobs and for sites where a cylinder is awkward. The trade-off is more spatter, heavier fume and slag to clean.

Short Note: Gas is a recurring cost many clients forget until the invoice. If your shop buys cylinders one at a time from different suppliers, compare contract supply and bulk pricing, and check what gas costs per hour of arc time. See the AllGas welding supply guide and the Airgas welding supplies buyer guide for what to ask a supplier.

Choosing the Right MIG/MAG Process for Your Metal

Two quotes can both read “MIG welding” and describe very different jobs: a 3 mm stainless handrail welded with a 98/2 argon mix and a purge blanket, or a 12 mm carbon steel base plate run with flux-cored wire. Matching gas, wire and transfer mode to the metal is what separates a good quote from a cheap one.

Carbon Steel and Low-Alloy Steel

The workhorse gases are 75% argon/25% CO2 (C25) and 100% CO2 (C100). C25 gives a stable, spatter-light arc in short-circuit mode, which suits thin sheet, tube and structural fit-ups; C100 costs less and drives more heat into the bead. Below roughly 6 mm, short-circuit keeps the puddle small and prevents burn-through; above about 10 mm, spray transfer takes over, giving deeper penetration and more metal per pass. Miller notes that modern MIG power sources now carry dedicated programs for C25, C100, C10, stainless, aluminium 4XXX and 5XXX and flux-cored steel, so picking a mode is a menu selection rather than an argument.

Quick Note: Pure argon alone is a poor choice for ferrous metals. It gives a lazy, low-penetration arc, which is why argon/CO2 blends dominate carbon steel GMAW. ESAB’s gas comparison shows how each blend changes bead shape, penetration and spatter.

Stainless Steel

For spray and pulsed spray, 98% argon/2% CO2 is standard. For short-circuit work, a tri-mix of about 90% helium, 7.5% argon and 2.5% CO2 handles the heat better on a stainless-capable machine.

Two things are non-negotiable. The root side needs a backing purge of argon, or the joint stains and pits underneath. The gun needs dedicated stainless wire and liner; a liner contaminated with carbon steel is how a bench-perfect joint rusts along the weld. Stainless fume deserves more respect than steel fume: OSHA’s hexavalent chromium guidance notes that stainless welding generally produces higher hexavalent chromium exposures than carbon steel welding, so local exhaust ventilation matters more here.

Aluminium

Aluminium is 100% argon. Its oxide skin melts far above the base metal, so it must be cleaned off mechanically and kept clean during the weld, and any CO2 in the mix raises contamination and porosity risk. AC cleans the puddle as it solidifies and was the traditional answer; most modern shops run DCEN for better penetration. Larger wire diameters need a spool gun and push-pull feed. Our complete aluminium MIG welding guide covers the setup, and prepping aluminium properly explains why a carbon-steel brush ruins a job.

Copper, Brass and Galvanised Steel

Copper and copper alloys weld well with argon or argon-helium blends and ERCuSi-A wire. High thermal conductivity makes the puddle run, so pulsed spray and preheat on thick sections help. Brass adds zinc to the fume, so treat it like galvanised material.

Galvanised and zinc-coated steel welds with the same C25 used for mild steel, but the coating must be ground back from the weld area or it fumes heavily and causes porosity. Flag galvanised work to the client first: welding it can cause metal fume fever, and some clients would rather change the finish than accept that risk.

Thick Sections

Heavy plate is a multi-pass job: spray transfer, bevel prep, interpass temperature control and preheat where carbon equivalent and thickness call for it. A qualified service states interpass limits in the procedure rather than guessing and plans a tacking sequence, because on thick plate distortion is the usual failure.

Solid Wire, Flux-Cored and Metal-Cored

Solid wire is the default: cheap, clean and easy to inspect. Gas-shielded flux-cored (FCAW) runs a cored wire such as E71T-1 in a CO2 or argon blend; the core adds deoxidisers, so the bead tolerates rust, mill scale and imperfect prep, with higher deposition rates. Self-shielded flux-cored (MCAW) needs no shielding gas at all, which is why it dominates long outdoor structural jobs and remote sites. Metal-cored wire is the hybrid: metal sheath, small flux core, FCAW deposition with a cleaner bead. Across all three the trade is the same: flux-cored gives up a little bead cleanliness for higher deposition rates and freedom from shielding-gas dependency.

Material Gas Wire Transfer Key risk
Mild / low-alloy C25 or C100 ER70S-6 Short-circuit, spray Rust, oil, porosity
Stainless 304/316 98/2 or tri-mix ER308L Spray, pulsed Carbon pickup, Cr(VI) fume
Aluminium 5052/6061 100% argon ER4043 / ER5356 Spray, DCEN or AC Oxide, porosity
Copper and brass Argon / argon-helium ERCuSi-A Pulsed spray Runny puddle, zinc fume
Galvanised steel C25 ER70S-6 Short-circuit Zinc fume, fume fever

When MIG Is the Wrong Process

Some work should never be quoted as MIG at all:

  • Dissimilar metals, where pool chemistry needs tight control.
  • Very thin or delicate parts, where burn-through dominates.
  • Cosmetic work the client will inspect closely, often a TIG job.
  • Repairs needing precise, low-heat control.
  • Remote sites with no reliable shielding gas supply.

MIG struggles on very thin material because the heat needed to fuse the wire exceeds what the sheet can absorb before it burns through. Short-circuit mode helps, but the puddle is still less controllable than a TIG arc, which is why a stainless handrail a client inspects daily often belongs to TIG.

Short Note: If a supplier quotes “MIG” without naming the gas, the wire and the transfer mode, they have not specified the process. Ask for those three, plus the backing purge detail on stainless, before comparing prices.

Benefits and Real Limits of MIG/MAG Welding Service

Anybody who has watched a MIG/MAG welder work for an hour knows the appeal. The gun moves, the wire feeds continuously, and a finished joint appears in seconds. Compare that with a stick welder stopping every couple of minutes to thread a new electrode into the holder, sweep the rod, and restart the arc, and the productivity difference stops being theory. Continuous wire feed is the core reason MIG/MAG service work is quoted faster and cheaper than SMAW on volume work, and it is why the process still dominates structural fabrication, production welding and repair shops worldwide.

But a straight list of advantages is a sales pitch, not an assessment. Here is the honest version, including the places where MIG/MAG quietly stops being the right answer.

Where MIG/MAG Genuinely Wins

  • Deposition rate and travel speed. Continuous wire feed removes electrode-change downtime entirely. A production cell running spray transfer can lay down far more metal per hour than a stick welder, and that translates directly into lower labour cost per metre of weld.
  • All-position capability. Flat, horizontal, vertical and overhead are all routine with the right technique and the right gas. The learning curve for a client-side operator is short compared with TIG, where a new welder spends weeks learning to hold a puddle.
  • Repeatable, clean beads on carbon steel. With 75% argon/25% CO2, you get the arc stability argon provides plus the penetration CO2 contributes, and less spatter than pure CO2 on its own. ESAB’s shielding gas comparison lays out the trade-offs clearly.
  • Easy integration with extraction and automation. A MIG gun is straightforward to hood with local exhaust ventilation, and GMAW is one of the most automatable manual arc processes, which is why AWS offers a Certified Robotic Arc Welding credential for shops running robotic cells.
  • Cost efficiency for structural and production work. For anything from frame fabrication to repeat batches, MIG/MAG is usually the lowest-cost qualified process available.

The Real Limits

The biggest honest caveat is heat. MIG/MAG runs noticeably hotter at the same joint than TIG, and that is the root cause of both distortion and a larger heat-affected zone. On thin or precision assemblies it shows up as warping, burn-through, or a change in the mechanical properties of the parent metal close to the weld. TIG spreads less heat and is far easier on delicate geometry.

Other limits worth pricing in:

  • Limited root-pass control. MIG/MAG is a fill-and-cap process in most hands. If the root pass needs to be the finished pass, TIG wins.
  • It depends on a clean gas supply and disciplined maintenance. A worn liner, a spattered nozzle or a cylinder with moisture in it will quietly ruin a weld. The process is only as good as the housekeeping around it.
  • CO2 spatter and cleanup. Pure CO2 is cheaper but throws more spatter, which means more time at the grinder and a rougher as-welded surface. On cosmetic work, that cost lands straight on your invoice.
  • Wind sensitivity. Outdoors, shielding gas is blown off the arc the moment the breeze picks up, which is where porosity starts. Wind screens or tents are not a luxury.
  • Dissimilar metals are a hard no. Joining aluminium to steel, or copper to steel, needs different filler and often different processes. MIG/MAG is the wrong tool for it.

The Hidden Cost Drivers

The quoted price rarely covers the whole job. It does not cover rework after a porosity rejection, post-weld grinding to tidy spatter, the shielding gas itself, or the PPE and extraction the welder needs. And because shielding gas consumption scales with arc-on time, a long field job carries a real gas and cylinder-hire cost that can be meaningful on a multi-week site weld. Nobody should be impressed by a quote that forgot to count those.

Quick Note: The cheapest quote is frequently the most expensive one once rework, gas logistics and inspection are counted. A bid that omits gas, procedure documentation or NDE is not saving money, it is deferring the bill until something fails. Compare bids on the same documented scope, not on the headline number.

So the sensible position is not “MIG/MAG good, TIG bad”. It is that MIG/MAG service is a process with variables: gas, wire, machine setup and technique. A professional service controls those variables in writing, which is exactly what you should be checking for. If you are still working out who can do the job, our aluminum MIG welding guide shows how much the material changes the setup, and why stick welding still wins in certain conditions.

Safety, Fumes and the Regulatory Side of Gas Welding

Most arguments about a gas welding job are not about weld quality but about what happened while the arc was lit: a cylinder parked in the wrong place, a fire watch that skipped the last half hour, or an extraction fan that was never switched on.

Two US regulations carry most of that weight: 29 CFR 1910.252 covers welding, cutting and brazing in general, while 29 CFR 1910.253 covers oxygen-fuel gas welding and cutting. 1910.253 is a different process from MIG/MAG, and clients mix them up constantly. Our guide to air gas welding explained sorts out that terminology.

Fire prevention and the fire watch rule

Under 1910.252(a) the area must be made safe before any arc is struck: move or cover combustibles, provide suitable fire extinguishers, and follow the site hot work permit system where one applies. The requirement people forget is the fire watch. Under 1910.252(a)(2)(iii) one is required when appreciable combustible material sits within 35 feet of the welding, and it must be maintained for at least 30 minutes after welding stops. That half hour is a real cost in a tight schedule, so a site welding quote should price it in rather than skip it.

Confined spaces, ventilation and fume control

Ventilation is not optional. 1910.252(b)(4) is explicit: ventilation is a prerequisite to welding in a confined space, cylinders and machines stay outside, and an attendant is stationed outside with a pre-planned rescue procedure. That last part is where the plan lives or dies, because a rescue plan written after someone collapses is not a plan. Local exhaust ventilation is the primary control, with the extraction hood as close to the arc as practical rather than across the shop where fume has already mixed into the air. Welding screens protect neighbours from arc radiation and stray UV; on a shared floor they are a legal expectation, not a luxury.

Quick Note: Flag galvanised or zinc-coated steel to the client in writing before welding starts. Zinc fume causes metal fume fever, and the client should know what their material choice costs in extraction and PPE.

The fume hazards nobody mentions

Welding fume is not one thing but a mixture whose composition changes with base material, consumable and shielding gas. The NIOSH welding topic page sets out the main concerns.

  • Metal fume fever (welder’s flu) is the classic result of zinc fume from galvanised steel and can also come from brass or bronze work. Symptoms appear hours after exposure, usually clear within a day or two, with no specific treatment beyond leaving the exposure.
  • Manganese is serious: prolonged exposure above 1 mg/m³ can cause manganism, a Parkinsonian syndrome that can be permanent. OSHA’s welding fact sheet and NIOSH both stress that arc welding fume is a leading source of manganese exposure.
  • Hexavalent chromium is generated when welding stainless steel, hard-facing or chrome-plated parts. OSHA’s 29 CFR 1910.1026 sets a permissible exposure limit of 5 micrograms per cubic metre (0.005 mg/m³) as an 8-hour time-weighted average, and Cr(VI) is treated as a serious carcinogen. See also OSHA’s hexavalent chromium overview.
  • Nickel compounds are recognised carcinogens and potent sensitisers, so stainless and nickel alloy work needs the same disciplined extraction as carbon steel.

Manganese limits differ between agencies, so name the number you measure against.

Authority Exposure limit Basis
NIOSH 1 mg/m³ REL, 8-hour TWA
NIOSH 3 mg/m³ REL, 15-minute STEL
OSHA 5 mg/m³ PEL, ceiling
ACGIH 0.02 mg/m³ TLV, respirable
ACGIH 0.1 mg/m³ TLV, inhalable

NIOSH also notes that welder’s anthrax is a rare but serious occupational disease among metalworkers, with a high mortality rate. Rare still means it happens, which is why fume control must be verified, not assumed.

PPE and respirators

Filter lens selection is set out in 1910.252(b)(2)(ii)(H), which recommends shade 12 lenses for gas-shielded arc welding of ferrous metals and shade 11 for nonferrous work. Getting this wrong is common and it is a safety issue, not a style choice. Aluminium has its own prep and cleaning rules in our aluminum MIG welding guide, and those jobs run on the lower shade number.

Respirators are a backstop, not a substitute for extraction. Where ventilation alone cannot hold exposure below the applicable limit, a properly selected respirator under a written respiratory protection programme is required, with fit testing for the wearer. Welding fume filters or supplied-air systems for high-chromium and galvanised work are standard kit for shops that take coated steel seriously.

The oxygen-fuel rules worth knowing

For torch work rather than a MIG gun, 1910.253 applies, and three clauses get quoted most often:

  • 1910.253(a)(2) prohibits generating, piping or using acetylene above 15 psig.
  • 1910.253(b)(4)(iii) requires oxygen cylinders to be separated from fuel gas cylinders by at least 20 feet, or protected by a rated noncombustible barrier.
  • Cylinders must be stored valve-end-up, secured and kept away from heat and traffic. Oil and grease must never touch oxygen regulators or fittings, because oxygen and hydrocarbons make an effective ignition source.

Our reference on air acetylene welding, torch basics and safety covers the bench side in detail, and why SMAW still wins on some site work is worth reading when gas availability on location is the question.

Where the contract comes in

Safety obligations are a contract issue as much as a legal one. A scope should name who provides hot work permits, who provides the fire watch, where extraction sits and what happens when galvanised material turns up unwarned. If a client wants fume extraction on site, a starting point for comparing options is this welding supplies buyer’s guide. Affiliate disclosure: weldgallery may earn a commission on some supplier links, so treat it as a comparison starting point, not an endorsement.

Gas suppliers are another quiet safety partner: a reputable one will talk through cylinder staging, regulator selection and handling. Our notes on gases, services and safety cover what to ask when the cylinders arrive.

Common Mistakes in MIG/MAG Service Work (and How to Avoid Them)

Most failed MIG welds are not mysterious. They trace back to a short list of fixable things: gas, cleanliness and heat input. Learn the pattern and you can spot a bad job from across the shop floor, and see who caused it.

Shop-Side Mistakes

  • Wrong gas for the material. Running 100% CO2 on stainless or aluminium produces a brittle, oxidised bead that stains and rusts early. C25 (75% argon/25% CO2) suits mild steel, stainless needs a tri-mix or 98/2 blend for spray transfer, and aluminium wants pure argon. ESAB’s gas comparison guide sets out the trade-offs.
  • Flow set by guess, not by flow meter, and no pre-flow. Too little gas leaves the puddle unprotected and porosity forms; too much creates turbulence that pulls atmospheric contamination into the weld, exactly as ESAB explains. The gas has to reach the work before the arc strikes, so Miller advises purging the cylinder valve before attaching a regulator and pre-flowing the gun. A flow meter at the gun ends a whole class of defects.
  • Dirty gun and worn consumables. Spatter and debris in the nozzle disrupt gas coverage, one of the most common causes of porosity on an otherwise sound setup, and a cup hammered back into shape with pliers is worse than a new one because the hole is distorted. Copper-coated wire dragged through a dirty liner oxidises and builds up until it drags and spatters. Contact tips and liners are consumables with a schedule, not an afterthought.
  • Wrong polarity. Solid GMAW wire on the wrong polarity produces poor transfer, excessive spatter and erratic arc behaviour. Solid wire needs DCEP (electrode positive). Get this wrong on a constant-voltage power source and the wire spits, the arc wanders and the bead looks like bad plumbing.
  • Tungsten contamination. Grinding stainless or carbon steel near a GMAW torch puts tungsten particles into the air and into the work. Those inclusions are hard to find later and are a classic cause of rejection on code work. Separate grinding from welding and clean the joint before welding.
  • No WPS and no plan. If the welder is working from a drawing and habit alone, nobody can say what heat input, interpass temperature or sequence was intended. Code work under AWS standards or ASME codes requires a written, qualified procedure.
  • Poor fit-up and no preheat plan. A 12 mm carbon steel plate closed to a 2 mm gap will burn through or cold lap, and neither is fixable with filler metal. Fit-up and preheat are part of the welding, not preparation somebody can skip.
  • Heat input too high. On thin stainless or aluminium a fat bead burns through and picks up too much nitrogen. On stainless, excess heat and slow travel give a coarse, heat-tinted grain with a dull finish that picks up rust.

Quick Note: Spatter, undercut, porosity and lack of fusion all rise when the contact tip-to-work distance is too long, because the shield gas is lost before it reaches the puddle. Keep the gun close; the gas has a limited reach.

Client-Side Mistakes

  • No drawing or unclear scope. “Weld up these brackets” is not a scope. Grade, thickness, weld length, position, finish and inspection expectations belong in writing.
  • Galvanised coating not disclosed. Nobody expected zinc fume, and the OSHA 1910.252 ventilation and PPE requirements change with the coating.
  • Work done in the open in a breeze. Wind kills shielding gas. A 10 mph crosswind scours the gas column off the puddle and no setting fixes the porosity.
  • No allowance for access or positioning. A tower handrail needs a lift, a harness and more set-up time than the same rail on a bench, so labour beats the quote.
  • Expecting a MIG price for a TIG finish. A flush, mirror-satin stainless weld is a TIG operation. Demanding that finish at MIG prices produces rushed work.
  • Changing material grade mid-job. A line call mid-run can swap the procedure, wire, gas and qualification requirement. Expect a price change, and expect it early.

Note: Two real examples cover most of it. A 304 stainless handrail that came back with rust bloom was a purging failure: the tube was never back-purged. A trailer frame that warped out of flat had no tacking sequence planned. Both were avoidable before the first arc.

How to Avoid Them on Your Side

Ask for the process and gas before work starts, and confirm the WPS matches the material. Watch the setup, not the arc: flow meter reading, pre-flow timer, clean gas cup, new contact tip. On site, confirm cylinders are staged and a fire watch is assigned under OSHA’s hot work standard. If the material changes, stop the job. On the client side, put grade, thickness, coating, weld length, position, finish and the work environment in writing, and flag galvanised steel. For material-specific prep and finishing, see our guides on aluminium MIG welding and choosing shielding gas.

Bad welds are rarely the fault of welding itself. They are the fault of gas that was not checked, dirt that was not removed, or heat that was not controlled.

Troubleshooting: How to Read a MIG/MAG Weld and Fix the Cause

A bad MIG bead is never random. Every crater, worm hole and lumpy edge is the machine telling you something upstream is out of balance. Trouble usually lives in a predictable order: gas delivery, gun consumables, wire condition, polarity and mode, work cleanliness. Most mysterious MIG faults sit in the first two buckets, and both are cheap to inspect.

The diagnostic sequence

Work through the machine in order rather than changing five settings at once.

  1. Measure gas flow at the gun with an external flow meter, not at the cylinder or regulator; the machine gauge sits upstream. Miller recommends an external flow meter for coverage problems.
  2. Inspect the nozzle and gas ports. Spatter-fouled cups, swapped diffusers and porous cups bleed the shield. Match cup to gas, diffuser to gun.
  3. Check the gas connections at the power source. Multi-process machines have separate TIG and MIG gas ports; on the wrong one the weld runs starved while the machine looks fine. Check the cylinder valve.
  4. Seat the gun properly. A gun not fully seated and locked leaks shielding gas around the drive housing rather than the inlet ports, so it looks like a gas problem.
  5. Check the contact tip and liner. A worn tip causes stubbing and erratic arcs; a contaminated liner lets the wire wander off the work.
  6. Verify polarity and machine mode. Solid wire GMAW runs DCEP (direct current electrode positive); wrong polarity strips the tungsten from a TIG electrode. Match the program to gas and wire.
  7. Re-check wire feed and travel speed once gas and gun are proven good: wire feed sets current, travel speed sets bead shape.

Quick Note: A sudden jump in spatter points at gas changeover and machine programming. A C25 mix (75% argon / 25% CO2) gives minimal spatter and a cleaner bead than 100% CO2, so rising spatter usually means changed cylinders or a re-set program. ESAB’s shielding gas comparison explains the differences.

Symptom, cause and fix

Symptom Likely cause Fix
Porosity (pinholes, worm holes) Nitrogen, oxygen or hydrogen in the pool: low flow, blocked nozzle, dirty lines, leaking seal, wind. Flow meter at the gun, clear nozzle, purge hose, seal gun, screen area, back-purge stainless.
Excessive spatter Wrong gas for the mode (C100 short-circuit), erratic flow, worn tip, wire too fast, oily wire. Match gas to mode, check flow, change tip, inspect spool, clean rollers.
Undercut at the weld toe Excess heat, wrong torch angle, fast travel, long stickout, too little argon. Lower current, raise travel speed, hold a 10 to 15 degree drag, shorten stickout.
Convex bead, excess reinforcement Too much wire feed for travel speed, cold lap underneath. Slow travel or cut wire feed, watch for cold lap, weave.
Lack of fusion or cold lap Travel too fast, long arc, wrong angle, scaled faces, low root heat. Slow down, tighten the arc, grind faces bright, add heat on thick joints.
Burn-through Too much heat on thin material, no backing, gap between parts, poor tacking. Cut current and wire feed, add a backing bar, close the gap, tack first, consider TIG.
Stubbing or popping at the gun Wire fed too long, worn tip, slipping liner, empty spool, drive not gripping. Check drive roll tension and gun seating, change tip and liner, match spool to liner.
Erratic arc or wandering Worn liner, wobbling wire, poor grounding, dirty work, unstable flow. Replace the liner, clean work and earth clamp, check flow and torch lead.
Tungsten or oxide inclusions GMAW gun fouled with TIG grinding dust, or slag left on the joint. Keep GMAW guns clear of TIG grinding, dedicate consumables and wire, clean the faces; dedicated kit is standard on stainless, as shown in guides to aluminium MIG welding and preparing aluminium properly.
Bead waves or drags Travel speed out of sync with wire feed, wrong torch angle, stiff cable, fit-up gap. Set feed and travel as a pair, keep the cable loose, fix fit-up.

How a service should respond to a defect report

When a client reports a failed weld, a professional service does four things in order: stop production on the affected part, isolate the cause instead of guessing, re-test on a coupon from the same material, and document the fix in the job record. Skip the coupon and the defect returns three weeks later.

Note: A qualified service keeps a written repair procedure ready before it is needed. Cracks, corrosion damage and failed inspections arrive without warning, and a plan already written can be executed the same day instead of under pressure.

Fume and safety limits still apply while chasing a defect, especially on stainless or galvanised work, so keep extraction running and follow OSHA 1910.252 and NIOSH on welding hazards. Never switch the ventilation off during a troubleshooting session.

MIG/MAG Service Compared With TIG, Stick, Flux-Cored and Laser

When deciding between welding processes, the question isn’t which one is “best” overall, but which one is right for the job at hand. A professional gas welding MIG/MAG service often sits in the sweet spot for many fabrication tasks, but there are times where TIG, stick, flux-cored, or even laser welding will be the smarter investment. Understanding the tradeoffs will save you from paying for the wrong process.

Head-To-Head Process Comparison

Every process has its strengths and weaknesses. The table below breaks down the factors that have the biggest impact on cost, quality, and practicality for real-world jobs:

Factor GMAW (MIG/MAG) GTAW (TIG) SMAW (Stick) FCAW (Flux-Cored) Laser Welding
Deposition Rate High Low Moderate Very High Moderate to High (automated)
Position Capability Good (with proper mode) Excellent Excellent Excellent (especially gas-shielded flux-cored) Limited to fixtured positions
Typical Material Thickness 24ga – 1″+ (multi-pass) Foil – 3/8″ (ideal for thin) 3/16″ – 1″+ 16ga – 1″+ Foil – 1/4″ (varies by system)
Cosmetic Finish Clean with minimal spatter Superior, near-perfect Rough, heavy slag Rougher than solid-wire GMAW Extremely clean
Heat Input & Distortion Moderate to High Very Low Moderate to High High Very Low (narrow HAZ)
Consumable Cost Moderate High (labor heavy) Low Moderate Very High (equipment)
Gas Requirement Yes (shielding gas) Yes (100% Argon or mixes) No Optional (self-shielded or gas-shielded) Sometimes (assist gases)
Field Portability Good (with gas cylinders) Poor for large field jobs Excellent Excellent (self-shielded) Very Poor

When To Choose Each Process

  • MIG/MAG (GMAW): This is the all-rounder. For structural frames, handrails, and fabrication work, MIG strikes the best balance of speed, cost, and productivity. It’s a go-to for steel fabrication, and with the right setup, can be used for aluminum jobs such as those covered in our Aluminum MIG Welding: The Complete Practical Guide.
  • TIG (GTAW): TIG wins when precision matters. It’s unmatched for thin material, sanitary piping, and cosmetic work where grind marks simply aren’t acceptable. However, its slow travel speed comes at a hefty labor cost.
  • Stick (SMAW): As outlined in our guide for the Advantages of Stick Welding: Why SMAW Still Wins, stick is king for outdoor repairs, dirty or rusty steel, and remote sites where gas cylinders simply aren’t feasible.
  • Flux-Cored (FCAW): For long, structural welds in the elements, flux-cored is hard to beat. It’s worth noting that gas-shielded flux-cored wire trades higher deposition rate and positional capability for more spatter and a rougher bead than solid-wire GMAW. Self-shielded variants are especially handy when wind is an issue.
  • Laser Welding: Laser welding is phenomenal for repeat production and thin sheet metal with its minimal heat input. However, as explored in our breakdown of Alpha Laser Welding: Systems, Uses, and Safety Guide, the extreme setup costs make it impractical for one-off jobs or most field services.

Quick Note: Gas choices matter regardless of process. According to ESAB, argon/CO2 mixtures are the most versatile general-purpose choice, sitting between the low cost of CO2 and the quality of argon. Helium blends deliver a hot arc and deeper penetration at higher cost and higher gas consumption, so they’re reserved for specialized applications.

Pricing: What Drives A MIG/MAG Service Quote

Speed doesn’t always mean cheap, and the cheapest quote is frequently the most expensive once rework is counted. When comparing service costs, these are the factors that truly drive the price:

  • Material & Thickness: Thicker materials require multi-pass welds, increasing time and consumables. Code work, such as projects under AWS D1.1 (structural steel) or AWS D1.2 (structural aluminum), will increase documentation requirements.
  • Joint Prep & Complexity: Beveled joints, tight corners, or out of position welds (overhead/vertical) will take significantly longer than a simple flat butt joint.
  • Weld Length, Access & Travel: Hard to reach areas, confined spaces, or jobs requiring scaffolding add labor hours very quickly.
  • Documentation & Compliance: For coded work, adherence to qualification standards such as ASME BPVC Section IX and inspection criteria outlined within AWS A3.0M/A3.0:2025 will be a line item on the quote.
  • Finishing, NDE & Certification: Dye penetrant testing, radiography, material certifications, and grinding/finishing all come at an additional cost depending on the acceptance criteria.

On top of this, minimum shop charges are normal for small jobs to cover machine setup and gas purges, whilst per-diem travel is expected for mobile services. All of these are legitimate costs, and a professional service will be transparent about them upfront. If a quote is suspiciously low with no breakdown of these items, it’s a major red flag for future rework.

How to Choose a MIG/MAG Welding Service: A Practical Checklist

Choosing a MIG/MAG gas welding service comes down to one buyer question: can this shop control the variables of a gas-shielded process in writing? Ask your questions before you award the job, not after the first rework lands back on your desk.

Ask what process, gas and wire they intend to use

Start narrow: “Which process, which shielding gas, which wire, which transfer mode for this joint?” A confident answer names all four. “We’ll MIG it” is not an answer, because GMAW covers short-circuit, globular, spray and pulsed spray, each behaving differently on the same material. Gas is just as specific: 75/25 argon-CO2, pure CO2 and a tri-mix are not interchangeable, so it should appear as a line item on the quote. If it is missing, ask what the shop uses and what bulk supply would cost, since cylinder and bulk gas pricing is a real cost line, not overhead to hide.

Ask to see the procedure and the welder’s records

Any shop working to a standard should hold a Welding Procedure Specification and current welder performance qualification records. Ask to see them, not a summary. Where ASME applies, the qualification standard is ASME BPVC Section IX. Structural work in the United States usually falls under AWS D1.1, welder qualification internationally under ISO 9606-1, and execution in Europe under EN 1090. Ask which governs your job, and why.

Then ask who inspects the work and what their credentials are. The AWS certification ladder is a useful shorthand: Certified Welding Inspector (CWI), Senior Certified Welding Inspector (SCWI), Certified AWS Welding Educator (CAWI), Certified Robotic Welding Inspector (CRI), plus the AWS Certified Welder Program. AWS also publishes an ASME Section IX endorsement for CWI and SCWI holders, plus certification endorsements covering the Welder Performance Qualification, the Welding Procedure Qualifier, Structural Steel (D1.1), Structural Aluminum (D1.2), Pipeline (API 1104) and the ISO standard. A shop that cannot name any of this runs on reputation, not records.

Ask what inspection is included, and against what criteria

“We inspect it” is not an answer. Ask which welds get visual, dye penetrant, magnetic particle, ultrasonic or radiographic examination, against which standard, and who signs the report. Then ask what you receive at handover: the WPS, welder qualification records, material certificates, NDE reports and inspection records. A missing deliverable usually means the work was never done.

Ask about insurance, hot-work safety and site access

For field work, ask about the hot-work permit, the fire watch and the cylinder staging plan. OSHA 1910.252(a)(2)(iv) requires the area to be inspected and precautions authorized, preferably by written permit, before cutting or welding is permitted. Confirm public liability and professional indemnity cover, adequate machine power, and who supplies wind protection outdoors. Access, lighting and staging are normally the client’s job, and if nobody says so, the schedule slips.

Ask for a written scope, a lead time and a failure plan

The written scope should list material grade, thickness, weld length, process, gas, NDE and, crucially, what is excluded. Then three commercial questions: what is the lead time, what happens when the drawing changes mid-job, and what happens if a weld fails inspection, who redoes it and how fast. Ask for references or comparable work, and whether the price is per weld, per metre or per day.

Red flags

  • No written procedure, or a WPS that is clearly an unread template.
  • No welder qualification records available on site.
  • An open-ended quote with no rate, scope or exclusions.
  • No safety plan for site work, no hot-work permit and fire watch.
  • Gas missing from the quote, or waved in as “included” with no detail.
  • A price far below the market. Someone must absorb the gas, wire, setup, inspection and risk. Usually they absorb the inspection.

Short Note: Five questions to ask before awarding any gas welding job: Which process, gas and wire? Where are the WPS and the welder’s qualification records? Which code governs the work, and who inspects it? What inspection and NDE is included, and against what criteria? What happens if a weld fails inspection?

Conclusion: control the variables in writing

MIG/MAG service is a process with variables: shielding gas, filler metal, machine setup, transfer mode and technique. A professional service controls them in writing, checks them and records them. A cheap service controls them by feel, and the difference surfaces later as porosity, rework and a client asking who paid for it. Judge the quote on the paperwork, the gas line and the inspection plan, and the number usually makes sense on its own.

For the practical side, the site’s aluminum MIG welding guide covers the clean-and-argon workflow, and why SMAW still wins on site work without gas. When a second process deserves pricing, compare the two side by side.

Frequently Asked Questions

Is “gas welding” the same thing as MIG/MAG welding?

Not technically, although most shops use the terms interchangeably. MIG/MAG is gas-shielded arc welding (GMAW), where an arc melts a continuously fed wire under a shielding gas blanket. True gas welding means oxy-fuel torch work, which OSHA regulates separately in 29 CFR 1910.253, including a 15 psig ceiling on acetylene pressure.

What shielding gas should I ask for on a mild steel job?

For carbon steel, 75% argon/25% CO2 (sold as C25 or M21) is the standard all-round choice because it gives a stable arc with minimal spatter and good bead profile. 100% CO2 is cheaper but throws more spatter, while 90% argon/10% CO2 suits spray transfer on thicker plate.

Can MIG/MAG welding be done outdoors or in windy conditions?

Yes, but the shield must be protected from the wind, so a wind block, tent or screening is standard practice on site. If that is impractical, a self-shielded flux-cored wire avoids the gas supply entirely and is often the smarter specification for long outdoor structural work.

When is TIG worth paying for instead of MIG?

TIG is the better choice for very thin or delicate material, highly visible cosmetic welds, precise root control, and repair work on stainless or aluminium where contamination matters. MIG is hard to beat for speed, thicker sections, structural fabrication and repeat production.

What actually drives the price of a MIG/MAG welding service?

Material grade and thickness, joint complexity and preparation, weld length, welding position, access and travel, plus any NDE and code documentation such as ASME Section IX or AWS D1.1 work. The cheapest quote often turns out to be the most expensive once rework, gas logistics and inspection are counted.

Can you MIG weld galvanised steel?

Technically yes, but the zinc coating vaporises into metal fume that can cause metal fume fever, so ventilation and respiratory protection matter more than usual. Always tell the service provider about the coating before quoting, and expect extra fume extraction on the job.

What should I ask a welding service to prove they are qualified?

Ask for the Welding Procedure Specification, the welder’s performance qualification records, the codes they work to, the inspection and NDE plan with acceptance criteria, and a written scope listing process, gas, consumables and inclusions. AWS certifications such as CWI and the Certified Welder Program are useful markers.

How do I know if the completed MIG/MAG weld is acceptable?

Acceptance is set by the governing code or contract, not by appearance alone. For coded work, a qualified inspector (CWI or equivalent) reviews the procedure and welder qualifications, and NDE such as visual, dye penetrant, magnetic particle or radiography is applied as specified before acceptance.

Is MIG/MAG suitable for production work and automation?

Yes. GMAW is one of the most widely automated arc processes, which is why AWS offers a Certified Robotic Arc Welding credential. Mechanised and robotic MIG cells are common for repeat part families in fabrication shops, though setup and programming cost only makes sense at volume.

NH

Nicholas Harper

Editorial Team

Covering welding processes, equipment selection, and shop-floor practice for WeldZen — with every claim checked against the governing code.

Share this technical standard

Related Studies

Technical Dispatch

Get The Next Benchmark First

New field studies and calibration sheets, once a week. No spam.