Drawn Arc Stud Welding Explained: Process, Parameters, Code and Troubleshooting

NH
Nicholas Harper · Oct 13, 2026 · 48 min read
Table of Contents

A composite floor deck can swallow more than a thousand shear studs in a single shift — each one made in a three-to-eight-second flash of arc, each one made while the welder is bent double over the beam with the fume rising straight into the breathing zone. When the shift’s first production test stud snaps at the fillet instead of bending, the problem is almost never the stud itself. It is the setup, and understanding that is where drawn arc stud welding really begins.

What Drawn Arc Stud Welding Is and Where You Will See It

Picture a seventh-floor composite floor rising over a parking garage. An ironworker is bent over a wide-flange beam, a semiautomatic stud gun hanging from his shoulder, welding shear connectors through metal deck into the beam flange. By the end of the shift there are roughly a thousand studs behind him, each one made in a flash of three to eight seconds. The next morning the shift starts over, and the first production test stud does something it should never do: it snaps at the fillet instead of bending. The steel was fine. The setup was not, and understanding why is where drawn arc stud welding genuinely begins.

What the process actually is

Stud welding is a semiautomatic electric arc process. A headed steel rod, the stud, is loaded into a chuck on the end of a stud gun. Pull the trigger and welding current flows from the gun out through the stud into the base metal, striking an arc between the base of the stud and the work surface. The stud is then plunged into that arc, molten metal climbs up around the base, and a fillet weld ring forms. The weld is made, the current drops, the next stud goes on the gun.

The word drawn is doing real work in drawn arc. The arc is physically stretched, or drawn, between the stud base and the workpiece for the length of the weld time. It is not a short-circuit process where the arc is made and broken repeatedly, and it is not a constant-purge process that blankets the puddle with shielding gas. It is a genuine stretched arc burning in plain air, which is why the weld runs hot, why the fume is significant, and why the process behaves the way it does under a torch.

Studs used in building and bridge construction typically run 12.7 mm to 25.4 mm (1/2 in to 1 in) in diameter and need roughly 800 to 1900 A DC. At that size and current, cycle time lands around three to eight seconds per weld and a typical stud welding team installs on the order of 1,000 studs in a single workday, according to the field research on stud welding published in the Annals of Occupational Hygiene study from the University of Iowa.

Where you will see it

The classic application is composite construction: steel beams and columns topped with a concrete slab poured on metal deck. Shear studs welded through the deck into the top flange tie the concrete to the steel, letting the beam act as a composite section rather than two separate materials sitting on top of each other. The stud carries longitudinal shear between the steel beam and the concrete slab, and that single fact is what makes composite floors and composite bridge decks work as designed.

You will also see drawn arc stud welding on bridge decks, steel deck edge angles, and in general fabrication: base plates, pipe supports, hangers, deck-mounted attachments, and a long tail of equipment mounting that would be tedious with a stick torch. Structural stud welding is governed by AWS D1.1/D1.1M, Clause 9, while shear stud connectors and headed studs are covered in AISC 360, Chapter I, Section I8.

Why fabricators reach for it

  • No drilled hole. Nothing comes out of the base metal, so there is no loss of section and no stress riser to worry about.
  • Works on thin and curved surfaces that resist drilling or conventional welding.
  • Production rate conventional attachment methods cannot match, especially with deck.
  • Consistency. A qualified machine setting repeats the same heat input stud after stud.
  • Easy verification. The stud can be bent to a specified angle and checked by eye.

That said, stud welding is a specialized tool, not a general substitute for a stick or MIG torch. Attaching a stud with a shielded metal arc process is slow, inconsistent and generally not code-compliant for structural work. The advantages of stick welding are real for the jobs they suit, but a composite shear connector is one place where a dedicated stud gun wins on speed, repeatability and acceptance criteria.

Stud materials

ASTM A108 carbon steel is the most common. ASTM A490 alloy steel and stainless grades are specified where higher strength or corrosion resistance is needed, and aluminum variants exist for specific applications. Whatever the material, the weld still has to be made under a qualified procedure, because a stud that is nominally the right alloy will still fail a bend test if the base metal was dirty or the current was wrong.

Quick Note: the vocabulary

Stud: the headed steel rod that gets welded to the base metal.
Ferrule: the ceramic or metal ring placed over the stud base; it contains the molten puddle, shapes the fillet and is broken off after the weld.
Stud gun: the handheld semiautomatic tool that holds the stud, sets lift and plunge, and draws the arc.
Controller: the power source that meters the current, weld time and lift/plunge sequence.
PJP: partial joint penetration, used for seismic studs where the weld must develop ductile behavior rather than a brittle shear failure.

Inside the Weld: How Drawn Arc Stud Welding Actually Works

Stud welding looks like one action from across a fabrication shop: press the gun down, hold the trigger, and a stud appears on the beam in a blink. Inside that blink is a tightly ordered sequence, and every step does something physical. Knowing the sequence separates a welder who can fix a bad setup from one who swaps the stud and tries again.

The sequence, step by step

  1. Load the stud. The headed stud goes into the gun chuck, which grips it by the threaded or collared end. A magnetized chuck holds it against the workpiece so it cannot shift when the arc strikes.
  2. Load the ferrule. The ceramic or metal ferrule slides over the base of the stud. It is a consumable, not decoration: it contains the molten pool, shapes the fillet around the base, and in ceramic form shields the arc from the atmosphere.
  3. Set lift and plunge. Lift is the gap the gun holds the stud above the work before the arc strikes. Plunge is how far the stud travels into that gap once the arc is established.
  4. Hold the angle. The gun is held about 20 to 30 degrees from vertical and perpendicular to the work, so the arc draws cleanly and metal flows around the stud.
  5. Make contact and trigger. The stud touches the base metal lightly and the trigger is pulled.
  6. The arc is drawn. Current flows from the controller, through the gun, through the stud, and into the base metal, physically stretching the arc between stud base and workpiece.
  7. The stud is plunged. The gun drives the stud down into the arc, and the molten pool climbs up around the stud base.
  8. The ferrule shapes the fillet. As the pool rises, the ferrule contains it and forms a smooth, continuous fillet around the base.
  9. Current drops. At the end of the programmed weld time, the controller cuts current and the puddle solidifies around the stud.
  10. The ferrule comes off. It is broken or knocked away, leaving the finished fillet for inspection.

What each variable actually does

Current melts the metal. Weld time allows fusion to complete. Lift is the gap that lets the arc form instead of the stud sitting on cold steel. Plunge is the depth of stud travel that forces molten metal up and around the base, and it decides whether you get a fillet or a cold scab. The ferrule governs fillet shape, and in ceramic form it also acts as a partial shield, holding some fume back from the immediate breathing zone. Get any one wrong and it shows up later as a fillet that looks wrong, a stud that unbends instead of bending, or a weld that cracks at the base.

Base metal cleanliness is a process requirement, not a finishing step. Paint, rust, mill scale, oil, moisture and zinc coating all prevent fusion. Grinding back to bright metal turns a coated beam into a weldable one. The air arc welding overview is a good reminder of how much surface condition matters in everyday arc work too.

Quick Note: Three timing numbers explain the whole family of stud welding processes. Drawn arc ignition depends on a weld time longer than about 100 milliseconds. Short-cycle ignition falls roughly between 5 and 100 milliseconds. Capacitor discharge finishes in about 1 to 3 milliseconds. How long the arc is allowed to live is what separates a hot, strong, ductile fillet from a fast, cool and small one.

How much energy is in a single stud?

In the University of Iowa study of drawn arc stud welding, the controller output was 44 volts DC at roughly 1,700 amps with a 0.95 second arc time, delivering about 71 kJ of energy into every stud. A modern resistance spot welder joining 16 gauge galvanized steel puts out roughly 2.4 kJ over the same 0.95 second duration, about 30 times less energy. This is a genuinely power-hungry operation, and the heat, fume and spatter that come with it are the direct result of that energy being dumped into one small ring of steel.

The term “drawn arc” is worth being precise about. Current is drawn through the stud and into the base metal for a relatively long period, not a momentary pulse. That sustained current produces a fillet with real penetration and real ductility, one that bends with the stud rather than fracturing at its base. It is also why stud welding has a reputation for being dirty work, a reputation the exposure numbers in a later section of this article will not support.

In practice, the arc is short-lived but the heat is not. A welder working a shift cycles the gun in 20 to 30 minute continuous bouts, holding that 20 to 30 degree angle while the pool is made and broken a thousand times over. For the specification requirements the process has to meet, the AWS standards library is the reference.

Drawn Arc vs. Capacitor Discharge vs. Short Cycle: Choosing the Right Process

Stud welding comes in three main automatic flavours, and the names describe how the arc is made: drawn arc, capacitor discharge (CD) and short cycle. From ten feet away they look identical. They are not interchangeable, and picking the wrong one gives a weld that passes a visual check and fails a bend test weeks later.

Characteristic Drawn Arc Capacitor Discharge (CD) Short Cycle
Weld time Longest, 0.3 s to over 1 s by stud diameter On the order of 1 ms Typically 5 to 100 ms
Peak current High and sustained, about 80 A per millimetre of diameter Up to about 3,000 A, but only for an instant Moderate, generally hundreds of amps
Base metal thickness Thin plate through heavy plate and beam flanges Thin sheet and light-gauge metal Thin to medium sheet
Heat input and distortion Highest heat input, most distortion and spatter Minimal heat input, virtually no distortion or burn-through Low, good for thin or finished surfaces
Weld ductility and strength Strongest and most ductile fillet Smaller, shallower, less ductile fillet Between CD and drawn arc
Ferrule type Ceramic (terracotta) ferrule that survives the long burn Metal ferrule Metal or ceramic, depending on equipment
Typical cycle rate 3 to 8 s per stud including handling Roughly a second or less per stud Around 2 to 4 s per stud
Applications Composite beams and slabs, bridge decks, deck edge angles, attachment plates Light-gauge sheet, HVAC and electrical supports, high-volume assembly Attachment on thinner material, product assembly, repair
Acceptance under AWS D1.1 / AISC 360 Fully accepted; the process AISC 360 assumes for shear studs Not accepted for seismic PJP studs; not expected for composite shear studs Only where the engineer of record explicitly permits it; not the default for composite shear studs

What actually happens in each process

Capacitor discharge works like this: capacitors are charged by the power source, then dumped through the stud in a pulse of roughly one millisecond. Because the energy comes out in a single spike, the base metal barely discolors and distortion is essentially zero on thin, coated or finished steel. The trade-off is the weld: a one-millisecond pulse gives a smaller, shallower fillet with less ductility than drawn arc, which is why CD is not the answer for a certified composite shear stud.

Short cycle sits in the middle. The arc is struck and held for a short, measurable period at moderate current, giving a better fillet than CD without the long burn of drawn arc. It is a sensible general-purpose process, but not the one engineers assume when they detail a composite slab.

Drawn arc is the reference process. The arc is stretched between the stud base and the workpiece and current flows for a substantial fraction of a second, producing the strongest and most ductile fillet of the three automatic methods. It also produces the most heat, spatter and distortion, the cost this article deals with. It is the method behind the shear studs on composite floors studied in the University of Iowa study of stud welding to bare beams and galvanized deck, and the method AISC 360 Chapter I, Section I8 assumes when it requires stud welding to conform to AWS D1.1.

Hand-stick stud welding fills a different niche. It is slow, generates more heat and gives a less consistent fillet than the automatic processes, but it is the practical answer for field repair, oversized studs and awkward locations where a stud gun will not fit or reach. Structural code still governs it.

When stud welding is not the answer

Fabricators reach for stud welding because the alternatives each give something up:

  • Self-drilling screws need no heat, no fume and almost no cleanup, and install on thin or inaccessible material. But a screw is not a certified shear connector, it stands proud of the surface, and it cannot satisfy a design calling for a headed stud.
  • Welded-in attachment plates solve a base metal too thin to hold a stud, or a spot the stud gun cannot reach. You pay with a second weld, more heat, a plate left in the work and another fillet to inspect.
  • Nuts welded to the base metal are fast for later bolting, but they are not structural shear elements, and the local heat can distort thin plate.

Quick Note: The decision rule. If the design calls for a certified shear stud under AISC 360, drawn arc is the answer, or another process your engineer of record permits in writing. For light-gauge sheet or high-volume non-structural attachment, capacitor discharge may be faster and kinder to the base metal. Ask the engineer before the first stud, not after the first reject.

One wrinkle from the international side. ISO 14555 groups stud products by material group and diameter, and the mapping is not one to one. For drawn arc stud welding of studs up to 13 mm diameter, material groups 8 or 10 cover material groups 1 and 2.1, and the relationship runs the other way as well. If your project is specified in ISO terms, check the cross-reference before you order the studs, not after the inspector asks. The standards themselves are published through the American Welding Society standards catalogue.

The Tool Kit: Stud Guns, Controllers, Ferrules and Studs

Most field problems with drawn arc stud welding are equipment problems, not procedure problems: a worn contact tip, a clamp buried in spatter, a ferrule left in a wet toolbox, a controller drifted out of calibration. Knowing the gear is how you tell a bad setup from a bad part.

The Gun

A production stud gun is semiautomatic: you slip the stud into the chuck, set the ferrule over its base, squeeze the trigger, and the machine strikes the arc and plunges the stud on a preset schedule. Chuck-type guns are the norm for drawn arc because they grip the stud hard enough to hold it against the arc reaction and the plunge force.

Feeding comes in two forms. With a manual gun the operator places each stud and ferrule by hand. With an auto-feed gun the studs come from a magazine or cartridge, keeping pace on a deck where a thousand studs must land in a shift. Small jobs and repairs still run manual.

Weight matters. In the University of Iowa study of drawn arc stud welding on composite floor decks, the conventional gun weighed 41.2 N, about 9.3 lb, and was hand-held for the whole shift: a load held at arm’s length all day.

The Controller

Behind the gun sits a constant-current DC controller, almost always microprocessor-controlled. The interface is modest: current, weld time, a weld counter, and a cycle timer. Many machines also carry a shot-count or production-test mode that counts out the studs the code wants tested before work resumes.

The controller used in that Iowa study was a 44 V DC microprocessor unit rated to about 1,700 A with a non-adjustable output voltage. Because the voltage is fixed, the only levers are current and weld time, and any change belongs in the qualified procedure rather than dialed in by feel. The governing AWS documents sit on the American Welding Society standards page.

Power, Cables and the Work Clamp

Stud welders usually run off site power: a diesel or gas generator on a deck job, mains power in a shop. Size the generator for the controller’s input and the duty cycle. A generator that sags under load shows up as erratic weld times and a wandering arc, often misread as a bad gun.

Two cables matter. The welding lead runs from the controller to the gun; the return (work) lead clamps to the base metal close to the weld. Clamping to the same piece being welded, near the joint, keeps the current path short and improves fusion.

Voltage limits come from OSHA 1910.254, which caps open-circuit voltage at 80 V for manual AC arc welding, 100 V for manual DC, and 100 V for automatic or mechanized arc welding. Stud welding falls in that last category, which matters when the gear runs off a deck generator.

Ferrules and Studs

The ferrule is the disposable mold that forms the fillet around the stud base. Ceramic ferrules are standard for drawn arc because they survive the long burn without melting back onto the joint, while capacitor discharge uses a metal ferrule. Both come in short and long versions sized to the stud diameter, so a mismatched ferrule will not shape a proper fillet no matter how good the settings are.

The stud family is wider: full diameter (FD) studs, reduced diameter (RD) studs, partial-joint-penetration (PJP) and seismic studs, plus stainless and aluminum variants for corrosion-prone or weight-sensitive work. Aluminum needs its own prep discipline, covered in our guide to cleaning aluminum for welding.

That means a consumable chain: one stud, one ferrule, both thrown away, both bought by the box. Running out mid-shift is a classic self-inflicted outage, so count the box against the studs you expect to place.

Keeping the Gear Alive

Quick Note: OSHA 1910.254 spells out the basics. Section (d)(2) requires coiled welding cable to be spread out before use so it does not seriously overheat and damage its insulation, and requires magnetic work clamps to be freed of adherent spatter. Section (d)(9)(iii) requires cables with damaged insulation or exposed bare conductors to be replaced rather than taped up, and lengths of work and electrode cable joined only with means intended for the purpose.

Spatter on a magnetic clamp is more than cosmetic. It raises contact resistance, meaning less current reaching the joint and a cold weld that may look passable and still fail the bend test. Clean the clamp every few studs, not at the end of the shift.

Stocking the rest of the kit? This welding equipment buyer’s guide helps sort the useful options from the shelf filler.

Setting the Parameters: Current, Weld Time, Lift, Plunge and Angle

Two knobs on a stud welding controller decide whether a weld passes inspection: current and weld time. Current melts the base metal and the stud end, while weld time decides how long the molten pools mingle, spread and freeze into a fillet with fusion behind it. Lift, plunge and gun angle deliver the heat as the procedure says.

The relationship is predictable: bigger stud, thicker base metal, more current and more time. A 12.7 mm stud on light gauge deck and a 25 mm stud on heavy plate are different weld problems.

Current Melts, Time Fuses

A commonly published starting point for drawn arc is on the order of 80 A of welding current per millimetre of stud diameter. For a 19 mm (3/4 in) stud that lands near 1,500 A, and the University of Iowa study of stud welding ergonomics and fume welded its 19 mm studs at 1,700 A, in the same band.

Quick Note: The 80 A per millimetre figure is orientation, not a setting. Thickness, coating and controller decide the real numbers; the qualified procedure decides in writing.

Starting Points, Not Gospel

Carbon steel stud, carbon steel base metal, reasonable thickness, controller in good condition: the band most operators work in.

Stud diameter Typical current Typical weld time Typical use
12.7 mm (1/2 in) 700–900 A 0.3–0.5 s Light gauge deck, attachments
19 mm (3/4 in) 1,000–1,300 A 0.5–0.8 s Standard composite shear stud
22–25 mm (7/8–1 in) 1,400–1

Setting the Parameters: Current, Weld Time, Lift, Plunge and Angle

Two knobs on a stud welding controller decide whether a weld passes inspection: current and weld time. Current melts the base metal and the stud end. Weld time decides how long the molten pools mingle, spread and freeze into a fillet with fusion behind it. Lift, plunge and gun angle deliver that heat the way the procedure says.

The relationship is predictable: bigger stud, thicker base metal, more current and more time. A 12.7 mm stud on light gauge deck and a 25 mm stud on heavy plate are different weld problems, and their settings should look different too.

Current Melts, Time Fuses

A commonly published starting point for drawn arc is on the order of 80 A of welding current per millimetre of stud diameter. For a 19 mm (3/4 in) stud that rule lands near 1,500 A, and the University of Iowa study of stud welding ergonomics and fume welded its 19 mm studs at 1,700 A, in the same band.

Quick Note: The 80 A per millimetre figure is orientation, not a setting. Base metal thickness, coating and controller decide the real numbers, and the qualified procedure decides them in writing.

Starting Points, Not Gospel

Carbon steel stud, carbon steel base metal, reasonable thickness, controller in good condition: this is the band most operators work in.

Stud diameter Typical current Typical weld time Typical use
12.7 mm (1/2 in) 700–900 A 0.3–0.5 s Light gauge deck, secondary attachments
19 mm (3/4 in) 1,000–1,300 A 0.5–0.8 s The standard composite shear stud
22–25 mm (7/8–1 in) 1,400–1,900 A 0.7–1.4 s Heavy studs, bridge decks, thick plate

Across the 12.7 to 25.4 mm range most drawn arc cycles land between 0.5 and 1.4 seconds of arc time, and both current and time climb with diameter. A 19 mm stud at 1,700 A and 0.95 s is a typical production setting on heavy composite deck.

Note: These are orientation points, not a qualified procedure. The WPS on site and the stud manufacturer’s table always govern. If the approved procedure says 1,250 A and 0.7 s, that is what you use, whatever this table says.

When the Numbers Fight Each Other

Most bad stud welds are not mysteries. They are the predictable result of four specific mismatches you can spot on the bench.

  • Too much current, too little time: spatter, a blown-out ring, shallow fusion. The arc outran the filler.
  • Too little current, too long a time: a cold, undersized fillet with poor penetration that cracks and pulls off in the bend test with almost no effort.
  • Too much energy for thin plate: burn-through, sagging and distortion that shows up hours later as a deck that will not lie flat.
  • Dragging the stud: moving the gun while the arc is live smears the pool instead of building it, leaving a cold weld with a lopsided fillet.

Lift, Plunge and the Angle of the Gun

Lift is the gap you leave between the base of the stud and the workpiece before you trigger, typically a few millimetres, so the arc has somewhere to strike. Too small and the arc will not strike cleanly; too large and you are fusing across a gap of molten air. Plunge is how far the stud travels into the arc once it is established. The controller drives the stud down at a set rate while molten metal climbs the stud base to build the fillet. Too shallow and the fillet sits on the surface; too deep on thin plate and you punch through.

Hold the gun at 20 to 30 degrees from vertical, with the base of the stud square to the work. The tilt lets the ferrule and the arc clear the surface and puts the weld metal where the fillet belongs. General arc mechanics are reviewed in the Arc Welder’s Guide; the stud-specific geometry lives in your WPS.

Your Settings Are Part of a Qualified Procedure

This is where good work gets thrown away. Current, time, lift, plunge, gun angle and the stud and ferrule combination all belong to the procedure qualified under the AWS structural welding code, which the AISC steel specification calls for on shear connectors. Codes allow a narrow band around those qualified values, commonly about ±10 percent on current and time, before the procedure must be requalified. ISO 14555 works the same way, tying the permitted parameter range to the tested material group and diameter.

Nudge the settings in the field because the weld looks wrong and you have stepped outside your qualified range. The shift’s bend test will not catch it, because that test used the qualified settings. It surfaces later, in the inspection report.

Short Note: A field adjustment that quietly fixes the weld without a paper trail is a future rejection. Parameter changes belong in the WPS and go through requalification, not in the operator’s thumb.

The Energy Arithmetic

Energy per weld is voltage times current times time. At 44 V, 1,700 A and 0.95 s that is 71,060 J, roughly 71 kJ delivered into a single 19 mm stud. A resistance spot weld in a car body panel puts in a fraction of that in a fraction of a second. That gap is why stud welding distorts more and throws more fume than the panel work most welders grew up on.

Base Metal Variables

Settings do not exist in isolation. They exist against a specific base metal in a specific condition.

  • Thickness. Thin plate caps how much current you can push before you burn through; heavy plate gives room but needs more energy to reach fusion.
  • Coatings. Welding through galvanized deck is generally not permitted by project specifications. The stud must be welded directly to the base metal, which is why the through-deck case shows up in research rather than in standard practice.
  • Cleanliness. Paint, rust, mill scale, oil, moisture and galvanizing all stop fusion. Each gets ground back to bright metal, and mechanical removal such as carbon arc gouging is sometimes used. Aluminum has its own prep rules in Aluminum Cleaner for Welding.

For a stud added after the fact, hand-stick stud welding is sometimes used on site; the trade-offs are in Advantages of Stick Welding, but it does not create a qualified shear connector without an engineer’s written approval.

Code, Qualification and Inspection: AWS D1.1 and ISO 14555

Stud welding is one of the few processes where the code will not accept a good welder with good equipment. It wants documented proof: a qualified procedure, a qualified welder, a passing production test at the start of every shift, and an inspection record. In North America the governing document is AWS D1.1/D1.1M, Structural Welding Code, and the stud welding requirements sit in Clause 9.

Clause 9 in plain English

Clause 9 is short and unforgiving: stud welding shall be performed by welders qualified in accordance with the code, using procedures qualified to the code. That means two qualifications, and neither covers the other. The procedure, a WPS and its supporting PQR, proves a set of parameters produces acceptable welds on a particular base metal; the welder qualification proves a particular person can make those welds. A flawless WPS does not qualify a welder, and an experienced operator is not covered by somebody else’s procedure.

Qualifying the welder

The AWS D1.1 welder qualification is built around ten test welds: two in each of the four positions, flat, horizontal, vertical and overhead, plus two more in flat, showing repeatability in the position the welder will work in most often. Every weld is evaluated by a qualified person, and the set is macro-sectioned so weld metal and fusion zone can be checked for cracks, porosity and incomplete fusion. Passing the bend test but showing a lamination or cold lap on the macro section still means failure.

Training new operators against a written procedure beats imitation. The Arc Welder’s Guide training material is a common reference, and the aerospace welding standards and careers guide makes the same point in a different context: qualification is a process you run, not a certificate you hold.

Requirement When it happens
Procedure qualification (WPS and PQR) Before production, and whenever the procedure changes
Welder qualification (ten test welds, macro-sectioned) Before the welder works to that procedure
Production test (five consecutive welds, all bend tested) Start of every shift, and after any change to parameters, equipment or base metal

The production test

Qualification is the slow part; the production test protects the project. It is five consecutive welds, all bend tested, repeated at the start of each shift and whenever welding parameters, equipment or base metal conditions change. That is where field arguments start: a new current setting, a different stud gun, a different beam with a different coating, a different ferrule size, a repair area ground back to bright metal. Each counts as a change, and each means another production test.

This is where the story at the top of the article resolves itself. Those first five studs of the shift get picked up, hit with a hammer, bent about 30 degrees and thrown in the scrap bin, destroyed on purpose, so a wrong lift setting or a dirty flange gets caught in the first minute of the shift rather than after a thousand studs are under the deck.

The bend test and the acceptance criteria

The bend test is the acceptance test, and it is simple. The stud is struck with a hammer or press and bent approximately 30 degrees from its original axis. If the stud bends and the weld stays intact, the weld is acceptable. If the stud breaks, or the weld cracks or peels at the base, it fails and the cause must be found before welding continues. A passing stud may be left bent; a failed bend test is a setup failure until proven otherwise.

Visual inspection covers the rest. The code and the project specification generally call for:

  • A continuous fillet weld all the way around the stud base
  • No cracks in the fillet or fusion zone
  • No undercut at the stud base
  • A minimum 1/16 in (2 mm) fillet weld leg around the stud base, unless the drawing or specification requires otherwise
  • Macro sectioning of qualification welds to confirm sound fusion

Inspection frequency is usually a bend-tested sample of studs from the lot, often around 10 percent, with the bend test performed the same way as the production test. Do not treat that percentage as a universal rule: confirm the frequency, weld size and test method against the current edition of the code and the project specification, because both can override the default.

The paperwork that has to exist

Auditors look for four things: the WPS and the PQR that qualified it; the stud manufacturer’s certification and mill test reports, confirming the studs welded were made to the specified grade and diameter; the operator’s qualification record showing who was qualified to run the procedure and when it was maintained; and the inspection log recording each production test, bend test, failure and corrective action. A stud later gouged out and rewelded goes through the same qualifying process, bend test included.

ISO 14555 and AISC 360

Outside the United States, ISO 14555 is the international standard for stud welding. It covers drawn arc products alongside the other stud welding processes, groups stud materials by material group and diameter, and for drawn arc stud welding up to 13 mm diameter covers material groups 1 and 2.1 under material groups 8 and 10. It carries its own bend test and macro test requirements for qualification and production, and its acceptance criteria are not identical to the AWS ones. Aluminum studs have their own preparation requirements, covered in the guide to prepping aluminum for welding.

Closer to home, AISC 360 Chapter I, Section I8 covers shear stud connectors and headed studs and requires the welding to conform to AWS D1.1. That is why a designer specifying a shear connector can demand a qualified procedure and a passing production test even when the drawings are silent. If a stud fails and must be removed, air arc gouging is the usual way back to clean metal before the replacement is welded.

Quick Note: What an inspector actually does. They pick a stud at random and ask for it to be bend tested in front of them. They run a gauge around the stud base to check the fillet leg against the 2 mm minimum, check that studs sit square and that ferrules came off clean, and look for arc strikes and spatter damage. Then they ask for the log, the qualification record and the WPS, and compare the logged parameters against the procedure. None of this is exotic. It is looking, measuring and comparing, which is why it works.

The Invisible Cost: Fume, Heat, Ergonomics and Fire

Stud welding has a clean reputation: short cycle, no shielding gas, no spatter trail, no grinding slag off a finished deck. Against aluminum flux core welding that reputation is earned, but not in absolute terms. The measurements tell a much less comfortable story than most shops assume.

The strongest evidence is a peer-reviewed University of Iowa study in the Annals of Occupational Hygiene, which measured the fume a welder actually inhales while stud welding composite beams with conventional handheld gear rather than laboratory surrogates. The study is open access.

Fume levels: bare beam versus galvanized deck

With conventional equipment, inhalable fume averaged 18.2 mg/m³ welding to a bare steel beam, nearly twice the ACGIH inhalable threshold limit value of 10 mg/m³ for particles not otherwise specified. Through galvanized composite deck, the situation most stud welders actually face, it climbed to 65.7 mg/m³, about six and a half times the TLV.

Measurement Bare beam Through galvanized deck
Total inhalable fume 18.2 mg/m³ 65.7 mg/m³
Zinc 0.21 mg/m³ 15.8 mg/m³
Iron Up to 15.8 mg/m³
Manganese 0.88 to 1.54 mg/m³

Zinc explains the jump. On bare steel it measured 0.21 mg/m³; through galvanized deck it hit 15.8 mg/m³. That is not the stud weld melting steel, it is the deck coating vaporized every time the arc is struck. The welder is smelting zinc off the deck and breathing the result. Manganese ran 0.88 to 1.54 mg/m³ against its 0.1 mg/m³ TLV, nine to fifteen times the limit, and manganese is the metal most associated with the neurological side of welding fume.

Quick Note: Primary particle diameters measured 31 ± 17 nm on the bare beam and 34 ± 34 nm through deck, and elemental mapping showed metallic nanoparticles rather than metal oxides. Freshly formed metal particles are chemically reactive and biologically available in a way that pre-oxidized dust is not. The fume is hot, sticky, freshly made metal at nanoscale.

Why the plume follows the welder’s face

The plume rises. A welder bent double over a beam puts their breathing zone in the path of that rising column and inhales the concentrated core at close range. The same plume disperses harmlessly for anyone standing upright 1.4 m away, which is why the helper feels fine while the welder cannot stop coughing by lunch. Dilution ventilation across a big open bay therefore may not protect the person who matters. You need capture at the source, not clean-up at the ceiling.

What welding fume does to you over time

The NIOSH Pocket Guide entry for welding fume lists metal fume fever (the flu-like Monday morning symptoms of fever, chills, nausea and malaise), interstitial pneumonitis that can progress after heavy or repeated exposure, and potential occupational carcinogen status with lung cancer as the cancer site. This is a chronic exposure, not a nuisance.

Stud welding can trigger a separate hazard too. OSHA identifies hot work such as welding stainless and other chromium-bearing alloy steels as a major source of hexavalent chromium, a known carcinogen. That matters if your shop runs stainless stud welding on the same extraction and respiratory program as carbon steel work.

The posture problem nobody budgets for

The ergonomics of stud welding are as measurable as the chemistry. The same Iowa work found a mean trunk inclination of 80.4 degrees with conventional equipment against 8.9 degrees using an upright system and tool balancer. Eighty degrees is not leaning, it is nearly horizontal, held for the length of a thousand-stud shift. Studies link low-back pain risk to the proportion of work time spent with the trunk flexed beyond 45 degrees, and chronic low-back pain prevalence sits near 40 percent among construction workers generally. Add the repetition, the twisting to reach flanges and the weight of the gun and cable, and you have a job that injures backs quietly and predictably.

Heat is the other hidden cost. A 1,700 amp stud weld is short, but a shift of them puts real radiant heat into the head and shoulders of someone bent over a beam, and heat stress on a hot deck in summer is a genuine exposure. OSHA’s 1910.253 welding, cutting and brazing standard sets the hot work program requirements that apply.

Fire: the 35 foot rule that catches people out

Stud welding on a composite deck is hot work on thin steel deck, often with timber, insulation and combustible coatings underneath. OSHA 1910.252 requires combustible materials to be kept at least 35 ft (11 m) from the work area during hot work, and where that is not possible, fire-resistant blankets or shields must protect the combustibles.

  • Hot work permit for every shift, signed before the first stud.
  • Fire watch with the authority to stop the job, present for the duration and 30 minutes after the last weld.
  • Extraction at the source: a hood or arm close to the gun, not a fan across the bay.
  • Respiratory protection where exposure limits are exceeded, under a written program with fit testing.
  • Eye and skin protection for welder and helper. A helper is not a spectator.

Short Note: Welding galvanized or coated steel is a trigger for a more formal review of controls, because you have added a vaporized metal with its own exposure profile to an already hot process. Document the decision, get the engineer’s approval for the coating, and put ventilation and respirator requirements in the hot work permit. Stud welding equipment also falls under OSHA 1910.254, which caps the voltage for mechanized welding equipment at 100 V, a detail that matters when the gun is powered off a site generator.

Bottom line: the invisible costs of drawn arc stud welding are not small. Fume sits above exposure limits in ordinary conditions and gets dramatically worse through galvanized deck. The posture is a documented injury mechanism, and the heat and fire risk are real. None of that means you should not run studs. It means budgeting for extraction, a tool balancer, a respiratory program and a hot work permit the way you budget for the studs themselves, because they are the same job.

Nine Common Drawn Arc Failures and How to Fix Them

Most stud weld problems arrive dressed as a mystery: the stud looks welded and the bend test snaps it off the flange. Here is the working list shops keep next to the controller.

1. No fusion, or the stud pulls off by hand

Cause: Contaminated base metal. Paint, rust, mill scale, oil, moisture or galvanizing sit between the arc and the steel, so the stud fuses to the coating. Insufficient plunge or a weak ground connection look the same.

Fix: Grind to bright metal, clean and dry, and confirm the ground clamp bites clean steel. On aluminum studs, oxide removal is not optional; see this guide to prepping aluminum for welding.

2. Porosity in the fillet

Cause: Oil, moisture, paint, grinding dust or debris trapped under the stud base. A damp or contaminated ferrule does the same.

Fix: Clean and dry the base metal and the stud, fit a clean ferrule, and check the gun. Porosity at the root means the arc never had clean metal.

3. Cracking at the fillet

Cause: Excessive heat input and a slow, restrained cooling pool, hydrogen picked up from moisture or oil, or a very hard result from welding unapproved materials.

Fix: Bring current and time back to the qualified values, remove hydrogen sources, and check the stud mill certification against the approved material list.

4. Undersized or missing fillet

Cause: Wrong ferrule size for the stud diameter, low current, short weld time, or not enough plunge for the puddle to climb.

Fix: Match the ferrule to the stud and adjust within the qualified range. AWS D1.1 requires a minimum 1/16 in (2 mm) fillet around the stud base, so a thin fillet is a code nonconformance, not a cosmetic complaint.

5. Undercut at the stud base

Cause: Too much current with too little travel, so the arc dwells at the root and digs in rather than sweeping around the base.

Fix: Reduce current, or increase weld time and lift so the puddle moves. Persistent undercut on one stud size means the table, not the gun, is wrong.

6. Burn-through on thin plate

Cause: Energy matched to the stud, not the plate. At 44 V, 1,700 A and 0.95 s, roughly 71 kJ goes into one stud, enough to punch through thin plate.

Fix: Drop current and time to the values qualified for that thickness, or use a smaller stud and a larger pilot hole.

7. Excessive spatter

Cause: Too much current, a dirty surface, a loose ground clamp, or welding through deck. The University of Iowa study saw substantially greater spatter through galvanized deck than on a bare beam, with particle number concentrations far above other arc welding.

Fix: Clean the surface, tune the current, and keep the clamp clean. OSHA 1910.254(d)(2) requires magnetic work clamps to be freed of adherent spatter on the contact surfaces before use. The same study measured manganese above its applicable limit in every condition tested, even on clean bare steel, so contamination control is a fume-control measure as much as a fusion measure.

8. The arc will not strike, or the gun trips

Cause: Bad ground, a worn contact tip, a damaged gun cable, or a controller fault.

Fix: Test the ground, inspect and replace the contact tip, replace any cable with damaged insulation rather than taping it, then reset the controller and check the gun range.

9. The stud is crooked or wobbles

Cause: Wrong gun angle, inconsistent lift, a bent stud, or a worn chuck.

Fix: Square the gun at 20 to 30 degrees from vertical, set a repeatable lift, sort out bent studs before they reach the gun, and check the chuck for wear.

Change one variable at a time

Reproduce the failure on a coupon before touching production, so you learn what the setup is doing without burning more studs. Change one variable at a time: adjust current, weld time, lift and plunge in sequence and record each result. If three settings move at once, a passing coupon tells you nothing, and the qualified procedure still does not cover what you just did.

A failed bend test is a setup failure until proven otherwise, so the fix belongs in the WPS as a documented change with the qualification behind it, not in the operator’s thumb. Field re-tuning until the studs pass is the fastest route to a rejected inspection and studs that have to be cut out.

Quick Note: failed production test vs. failed production weld. A failed production test, the bend-tested sample taken at the start of the shift, means the setup is not qualified: stop welding, work the problem on coupons and requalify. A failed production weld found during sampling is different: that stud is rejected, the welds around it are suspect, and you owe the engineer an extent-of-condition check plus a disposition for each affected weld. One is a machine problem. The other is a liability.

Field Practice: Faster Studs, Better Fills and Fewer Rejects

A good production day is decided before the first stud is struck. The welder who resets the angle, re-clamps the ground and re-checks the lift on every stud will never beat the one who sets the station up once and leaves it alone.

Monday morning: prepare the metal

Start at the joint, not the gun. Grind the stud location back to bright metal and remove paint, rust, mill scale, oil and moisture. Each is a fusion killer, and cleaning costs a fraction of re-welding a rejected stud. Check base metal thickness against the qualified procedure, since thin and heavy plate cannot share the same settings. Where a coating has to come off, air arc gouging and carbon arc gouging strips it back clean and fast.

One shop practice deserves a clear label: pre-drilling a pilot hole slightly smaller than the stud diameter on thin or finished plate. It cuts spatter and lowers heat input, because the stud is driven into a partly formed hole instead of a closed surface. It is not an AWS D1.1 requirement and does not replace a qualified procedure, but it belongs in the WPS.

Setup: where the clock is actually won

Clamp the return lead close to the weld and on the same piece of steel being welded. Set the gun at 20 to 30 degrees from vertical, square to the work. Set the lift once and leave it there. Confirm the stud and ferrule match the gun and controller setup. Two habits cut rework most: staging studs and ferrules at the point of work, and parking the ground clamp next to the weld instead of trailing it across the deck.

Before the first pull, check every connection to the machine and spread out coiled welding cable. OSHA 1910.254(d)(2) requires all connections to be checked before operations begin and coiled cable spread out so it does not overheat. On a generator site that is five minutes of cheap insurance.

The weld itself

Pull the trigger steadily and hold the gun still through the burn. The urge to drag the stud to “help” the arc is the most common cause of a cold, undersized fillet. The observed cycle time is 3 to 8 seconds per weld, and each of those seconds is where a defect is born or prevented. Moving faster fixes none of them.

After the burn

Knock off the ferrule and look at the fillet. Inspect every stud visually for the first hour of the shift, then sample at the frequency the code and specification require. Run the five-stud production test at shift start and again after any change to parameters, equipment or base material condition. Bend testing is destructive, which is why the first studs of a shift get sacrificed: it is a feature of the control system, not waste. A stud that bends smoothly instead of snapping at the fillet tells you the setup is good before you have placed a thousand of them.

Throughput and ergonomics

Stud welding runs in continuous bouts of 20 to 30 minutes before the equipment has to be moved. In that window the gains come from setup, staging and ergonomics, not from squeezing the trigger faster. Stage studs and ferrules within arm’s reach and keep cables out of the walk path.

The upright system evaluated in the University of Iowa study cut inhalable fume to 7.2 mg/m3 on bare beam and 23.4 mg/m3 through galvanized deck. That is a real improvement over conventional equipment, but the deck figure still sits above the 10 mg/m3 inhalable TLV, so ventilation stays necessary. A tool balancer and an upright stand keep the welder out of the stooped posture that drives low-back risk. Rotate tasks and take micro-breaks; posture, not the arc, is what wears people out. Details are in the peer-reviewed study in Annals of Occupational Hygiene.

New welders and the paper trail

Run new starters on coupons with an experienced mentor before they touch production steel. The paper trail matters as much as the fillet: the WPS and PQR, the stud manufacturer’s certification, the operator’s qualification record, the production test log and the inspection log all have to exist. Keep them current, keep them with the work, and ready when an inspector walks the deck. Current requirements are listed through the American Welding Society standards and AISC steel standards pages.

Quick Note: Field checklist

  • Clean to bright metal; dry, no paint, rust or oil
  • Pilot hole, if used, undersize and in the WPS
  • Ground clamp on the same piece, close to weld
  • Gun 20 to 30 degrees from vertical, square
  • Lift set; stud and ferrule matched to gun
  • Connections checked, cable spread out (OSHA 1910.254)
  • Five-stud production test at shift start and after changes
  • Every stud inspected the first hour, then sampled
  • Ventilation in place, especially through deck

Note: If the shift ends with more rejected studs than the log can explain, the answer is usually in the first ten minutes of the day, not the last. Write down what you changed, when, and who changed it. A weld that failed because the setup drifted is a setup problem, and only a record shows the drift.

Where Drawn Arc Stud Welding Is Headed

For all of its reliability, drawn arc stud welding is far from stagnant. The industry is changing all around it, driven by automation, stricter design requirements, and a long overdue focus on the well being of the welders that keep these jobs moving.

Automation and The Changing Skill Set

On high-volume composite floor and deck projects, the future is already here. Automatic deck stud welding machines are becoming commonplace, and in controlled production environments, robotic stud welding is beginning to take hold. These systems are able to fire hundreds of studs with unwavering consistency, all whilst eliminating the need for an operator to crouch over every individual weld.

That being said, this won’t eliminate the trade, it will evolve it. The welder of tomorrow will need to know just as much about programming a carriage or calibrating a networked controller as they do about the arc itself. The knowledge of fusion will never become obsolete, it will simply be applied to a new set of tools.

Smarter Inspection Methods

Despite all of the innovation surrounding the equipment, bend testing will forever remain the standard destructive acceptance check. When done correctly at the start of a shift, it’s still the quickest and most honest way to catch a bad setup before production begins.

However, for the most critical of projects such as bridge work, magnetic particle and ultrasonic testing are being utilized more often for non-destructive verification of stud-to-base-metal fusion. These methods aren’t a replacement for a qualified procedure, they’re an added layer of confidence for welds that simply cannot fail.

Tighter Codes and a Human Focus

The bar for acceptance is only getting higher. The current edition of the structural welding code is AWS D1.1/D1.1M:2025 with Amendment 1, and AWS has authored more than 350 welding standards and codes to uphold it. Alongside AISC 360 Chapter I and AWS D1.1 Clause 9, seismic provisions are continuing to drive the adoption of PJP and seismic studs. With less wiggle room than ever before, there is no room for guesswork within a qualified WPS.

Most importantly, the industry is finally addressing the human element. Peer reviewed findings, such as those published within the University of Iowa’s fume exposure study, have proven that drawn arc fume can exceed exposure limits, especially when welding through galvanized deck. Paired with the extreme trunk flexion of composite work, these hazards are very real. For this reason, the best employers are investing in extraction, articulated arms, tool balancers, rotation, and proper respiratory controls to protect their workforce for the long haul.

Quick Note: No matter how automated or code driven this trade becomes, never forget these ten staples:

  1. Keep the base metal clean.
  2. Match current and time to diameter and thickness.
  3. Respect lift/plunge/angle.
  4. Qualify before you produce.
  5. Bend test at the start of the shift.
  6. Treat fume as a real exposure.
  7. Fix your ergonomics.
  8. Change one variable at a time.
  9. Document everything.
  10. Never weld through coated steel without an engineer’s written approval.

All of the robots, standards, and extraction hoods in the world exist for the same reason they always have. So that the first production test stud of the shift bends like it’s supposed to, instead of snapping at the fillet. That’s the standard. It always has been, and it always will be.

Frequently Asked Questions

What is the difference between drawn arc and capacitor discharge stud welding?

Drawn arc uses a continuous arc burned for roughly 100 ms or longer at a controlled current, producing the strongest and most ductile fillet of the automatic stud processes. Capacitor discharge dumps a stored charge very quickly, about 1–3 ms with peak currents that can reach 3,000 A, so it is much cooler and faster but makes a smaller, less ductile weld. AISC 360 composite shear studs normally assume a drawn arc process.

What current and weld time do I need for a 3/4 inch (19 mm) stud?

A widely used starting point is roughly 1,000 to 1,300 A for about 0.5 to 0.8 seconds, and published parameter tables scale current at about 80 A per millimetre of stud diameter, which lands near 1,500 A at 19 mm. The University of Iowa study ran 1,700 A at 0.95 seconds for a 19 mm stud. Always set your values from the qualified WPS and the stud manufacturer’s table, not from a generic range.

Can you stud weld through galvanized steel deck?

Generally no. Most project specifications and AISC 360 practice require the stud to be welded directly to the base metal, so the deck is drilled or a hole is cut at the weld location. Welding through galvanized coating vaporizes zinc, and the study measured 15.8 mg/m3 of zinc in the fume compared with 0.21 mg/m3 on bare steel.

What is the minimum base metal thickness for drawn arc stud welding?

Drawn arc stud welding generally needs about 3 mm (1/8 in) or thicker base metal because of the high heat input of roughly 70 kJ per weld. For thinner or finished sheet, capacitor discharge or short cycle is usually the better choice, since it delivers far less energy and is less likely to burn through.

How often should studs be bend tested?

AWS D1.1 requires a production test of five consecutive welds at the start of the shift and whenever parameters, equipment or base metal conditions change. Ongoing inspection is normally done by bend testing a sample of studs from the lot, commonly around 10 percent, with the exact frequency set by the project specification and the current edition of the code.

Why is my stud weld not bonding to the steel?

Nine times out of ten it is surface condition: paint, rust, mill scale, oil, moisture or a galvanized coating under the stud. Grind back to bright metal, confirm the ground clamp is clean and tight on the same piece, and check that the gun has a proper lift and plunge. If the surface is already clean, suspect the parameters or the ground connection rather than the stud.

Is stud welding safer than MIG welding?

It is not automatically safer. Stud welding has less heat and no filler metal, but the fumes it produces are concentrated and can be surprisingly high, and the stooped posture required drives low-back loading. The study measured 18.2 mg/m3 of inhalable fume on bare beam and 65.7 mg/m3 through galvanized deck, so extraction and ergonomics have to be managed deliberately.

What PPE do I need for drawn arc stud welding?

You need arc-rated eye protection with side shields, flame-resistant clothing, leather gloves and safety footwear, plus hearing protection on long shifts. Add a properly rated respirator if ventilation cannot keep exposure below the applicable limits, and remember that spatter burns are common enough to warrant an apron or sleeves on the hands and forearms.

Do I need to be certified to stud weld?

Yes. AWS D1.1 requires stud welding to be performed by qualified welders in accordance with qualified procedures, with the qualification test program and the shift-start production test documented and available to the Engineer. Many fabricators also run their own in-house stud welding certification, and it carries well when a welder moves between shops.

NH

Nicholas Harper

Editorial Team

Covering welding processes, equipment selection, and shop-floor practice for WeldZen — with every claim checked against the governing code.